Continunig upgrading at mainfield, is seeing alot of the old structurs  replaced with new more suited and safer buildings. Over the past 3 years RAMZE DEMOLITION has worked with mainfield pulling down a lot of these buildings so developments can take place.  Humphries Construction got the job to build a new control tower and we got the contract to pull the old tower to bits. Not alot of salvage, just the usual electrical fittings, some good windows, pine T&G flooring and some great long steel beams. The old tower had seen alot of laps in her day, and i bet thousands of people walked underneath!! Because the track is used constantly, the old building was craned down in 1 piece, and  lifted out of the way, so we could demolish in a safe area. 18meters long it was a big haul.

                                               GOING.....GOING..... GONE!!!!!!!!!

 